Jiangsu hongguang steel pole co.,ltd

PROFESSIONAL MANUFACTURER HIGH QUALITY

Manufacturer from China
Verified Supplier
10 Years
Home / Products / Substation Steel Structures /

230KV Electrical Power Substation Steel Structures With Hot Dip Galvanization

Contact Now
Jiangsu hongguang steel pole co.,ltd
Visit Website
Province/State:jiangsu
Country/Region:china
Contact Person:MsTang
Contact Now

230KV Electrical Power Substation Steel Structures With Hot Dip Galvanization

Ask Latest Price
Video Channel
Brand Name :JSHG
Model Number :HG-SS-10-750KV
Certification :ISO/CNAS/IAF/CA
Place of Origin :China
MOQ :One 40 HQ Container
Price :negotiation
Payment Terms :L/C, T/T or Western Union
Supply Ability :3,000 Tons per month
Delivery Time :2 weeks per container after PO/drawing/prepayment confirmed
Packaging Details :Covered by Plastic Wrap or Mat or according to client's requests.
Application :Electrical Power Transformer Substation / Switch Yard
Voltage Grade :10-750KV
Material :Q235 , Q345 , Gr.50 , Gr.65 , SS400 , etc.
Appearance Treatment :Hot-dip galvanized / Painting
Welding :Complies with AWS D1.1 standard
Connection Structure :Overlap / Flange connection
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description


230KV Electrical Power Substation Steel Structures with Hot Dip Galvanization

Specifications:

Application

  • Electrical Power Transformer Substation / Switch Yard

Voltage Grade

  • 10~500KV (10KV, 13.8KV,33KV, 35KV, 66KV, 110KV,132KV, 220KV, 230KV, 330KV, 500KV or Others )

Material

  • Hot Roll Steel Q235 , Q345 , Q420 , Q460 , ASTM A527 A36 , GR50 , GR65 , ST-37 , ST-44 , ST-52 , S355JR , S355J2G3 , SS41 , SS50 , SS55 and others equivalent steel material

Wall thickness

  • 2~30mm

Once Forming

  • 16m Once forming without joint

Welding

  • Welding complies with AWS D1.1 standard.
  • CO2 welding or submerged arc auto methods
  • No fissure, scar, overlap, layer or other defects
  • Internal and external welding makes the pole more beautiful in shape
  • If customers need any other requirements of welding, we also can make adjustment ad your request

Joint

  • Joint with insert mode, flange mode.

Galvanization

  • Hot dip galvanization in accordance with Chinese standard GB/T 13912-2002 and American standard ASTM A123.
Export Experiences
  • Philippines , Malaysia , Pakistan , Russia , UK , Australia , Ghana , Angola , Tanzania , Slovakia , New Zealand , Sierra Leone , Bangladesh , Maxico , Nigeria , Republic of the Congo , etc,
Advantages
  • Short Construction Cycle
  • Low Overall Cost
  • Easy Installation and Maintenance
  • Anti-corrosion
  • More than 17 years Design & Manufacture Experience
  • Capable to Handle Volume Orders
  • ODM, OEM Acceptable
  • Technical Support by E-mail


Product Details

230KV Electrical Power Substation Steel Structures With Hot Dip Galvanization

Description:

The electrical substation steel structure is the main load supporting structures of substation, so its quality has direct relation with the safety and reliability of power grid operation.

Our company has 17 years' manufacturing experience as well as advanced equipment, excellent technical staff and mature technology, which will assure the welding quality of steel structures, the galvanization quality and the firmness. Meanwhile, we have a whole set of quality test equipment to determine the physical properties and sizes of all steel structures, ensuring the desirable quality of the whole electrical substation structures.

Pre-assembly
230KV Electrical Power Substation Steel Structures With Hot Dip Galvanization
Quality Control Management
230KV Electrical Power Substation Steel Structures With Hot Dip Galvanization230KV Electrical Power Substation Steel Structures With Hot Dip Galvanization


Terms and Conditions

1. Price Term: EXW, FOB, CFR or CIF.

  • Shipping seaport: Shanghai Seaport.
  • Please provide drawings if you have so that we can calculate the accurate price for you.
  • We also provide design according to your requests, if you don't have drawings.

2. MOQ: One 40FT Container.

3. Payment Term: Typically 30% by T/T as deposit, balance by T/T or L/C at sight before shipment. Other payment way can be negotiated.

4. Delivery Time: 2 weeks per container after PO/drawing/prepayment confirmed.

5. Package: Normally wrapped by plastic bags or burlap cloth at the top and bottom, or according to clients requirement.


Our Services

  • Reply within 24 Working Hours
  • Factory Direct Sale
  • More than 15 Years Design & Manufacture Experience
  • Capable to Handle Volume Orders
  • High-Quality and Low-Price Products
  • Provide Professional Design by Our Experienced R&D Engineers
  • Rich Exporting Experience
  • ODM, OEM Acceptable
  • Technical Support by E-mail
  • Calling service

Please feel free to contact us!

10-750KV Hot Dip Galvanized Electrical Power Substation Steel Structures for Power Transformer Substation.pdf

Inquiry Cart 0